Industrial Warehouse Expert Reports

Industrial · B2B · RSCIEI · TR-34

Logistics pavements, steel structures, weld fatigue, post-lease damage and RSCIEI compliance. For insurers and industrial operators.


RSCIEILogistics pavementsPost-lease damageSteel structureTR-34Industrial claim

Specialised industrial assessment

Logistics warehouses have their own regulations. Main disputes: post-lease damage, fire claims, pavement failures and RSCIEI compliance.

Logistics pavements and fires

Shrinkage or settlement cracks in floor slabs · insufficient flatness for VNA equipment · poorly executed joints. Tolerances in accordance with TR-34 standard. In fires: cause and origin, damage to steel structure and verification of RSCIEI compliance at the time of the incident.

Fields resolved with an external expert

Where the subject matter of the report exceeds the signing expert’s accredited competence, the corresponding section is drafted by an expert in that field and attributed to him in the report. The expert panel lists the six fields in which this occurs and the basis of standing required in each.

§ 06 · Frequently asked questions

Before commissioning a report

01 What is the RSCIEI? +
The Industrial Fire Safety Regulation (RD 2267/2004). Non-compliance is a frequent cause of dispute.
02 What is a post-lease report? +
It determines which damages are normal wear (landlord's responsibility) and which are attributable to the tenant for improper use or unauthorised modifications.
Case file · EXP·08
Free consultation
01Type of report — party-appointed, court-appointed or counter-report
02Technical complexity of the case
03Court ratification included
04Travel anywhere in Spain within 24–48h
Discuss this report
Court ratification included · All Spain
Not a professional? Tell us about your case as an individual →
Other reports

Related services

View all reports
Case qualification

Do you need this report?

Free initial consultation. Contractual delivery deadlines.

Discuss your case
Call Send email