Civil Works Technical-geotechnical expert report justifying...

Geotechnical Expert Report for Industrial Pavement: Claim for Compaction Defects

A logistics operator required an expert report on severe pathologies in the pavement of a new logistics platform — subsidence, deflections and premature cracking — in order to hold the construction company liable.

Assessed amount
+€115,000
Client
Logistics operator
Delivery time
60 days
Jurisdiction
Civil · Barcelona
Result
Technical-geotechnical expert report justifying demolition and comprehensive repair for over €115,000
§ The case, step by step
01

The assignment

A logistics operator required an expert report on severe pathologies in the pavement of a new logistics platform — subsidence, deflections and premature cracking — in order to hold the construction company liable.

02

The technical investigation

Inspection of the platform, core extraction with a rotary drill (HILTI), mechanical borings (SPT), DPSH dynamic penetration tests and laboratory testing (granulometry, plasticity, collapse oedometers). Cross-checking of data against the original project drawings.

03

The expert report

The report evidenced serious construction negligence: non-compliant compaction (1.5 m layers vs. the required 20-25 cm), critical bearing capacity (CBR < 3 vs. required ≥ 6) and breach of Spanish road standard 6.1 IC on pavement thicknesses.

04

The outcome

Valuation of over €115,000, with the certified report serving as definitive evidence for the claim for full repair of hidden defects against the builder.

Standards and techniques applied
GeotechnicsIndustrial PavementCivil WorksHidden Defects
§ Your case

Do you have a high-value case?

Technical briefing with your lawyer or claims director. Free preliminary viability analysis, fixed written fees.

← Cases
Call Send email